What inspectors check on a residential solar install

Passing inspection is not about luck — it is about matching the approved plans and the code the inspector is required to enforce. An inspector works from a checklist tied to the NEC, the IFC/IRC, and your submitted drawings. Knowing what they look for lets you build it right the first time.

Rough vs. final inspection

Some AHJs split solar into two visits. A rough inspection happens before anything is concealed — roof attachments, flashing, and any conduit that will be buried in a wall or attic. A final inspection covers the finished system: the modules, inverter, disconnects, labeling, and grounding.

Many residential jobs get one combined inspection instead. Either way, the concealed work has to be visible or documented when the inspector arrives, so plan the sequence with your permit set in hand.

Structural and mounting items

Inspectors frequently probe attachments to confirm they hit framing. If your plan specifies a fastener and spacing, the field install must match it exactly.

Electrical items

Labels, placards, and disconnects

Labeling is one of the most cited final-inspection items. Inspectors look for the PV system disconnect marking, the rapid-shutdown placard, the directory/plaque at the service, and warning labels on junction boxes and conduit. A missing label is a quick fix but still a failed inspection and a return trip.

The AC and DC disconnects must be present, accessible, and labeled, with the utility-required lockable AC disconnect where the interconnection agreement calls for one.

Build to the plan: the surest way to pass is a complete, code-correct design. Run yours through the free Design Grader before you file, so the set the inspector holds already matches the code they enforce.

Match the stamped plans

The single theme across every inspection is consistency: what is on the roof must equal what is on the approved drawings. If a field change was necessary — a different module, a relocated disconnect, a revised attachment pattern — document it and, when the change is significant, submit a revision before the inspection rather than surprising the inspector.

A design tool cannot guarantee approval, and a licensed electrician or PE must review and stamp the electrical and structural work. But a clean, code-accurate set that the installers actually follow is what turns an inspection into a formality. When you are ready to build the drawings, start with our DIY workflow or review the reference library for the code details behind each check.

FAQ

What is the difference between a rough and a final solar inspection?

A rough (or in-progress) inspection covers concealed work like attachments, flashing, and conduit before it is closed up; the final inspection verifies the completed system, labels, disconnects, and that everything matches the approved plans.

Do all solar installs get two inspections?

Not always. Many residential rooftop jobs get a single combined inspection, but AHJs with structural concerns or conduit in walls often require a separate rough inspection first. Confirm with your AHJ.

What is the most common reason a solar inspection fails?

Missing or incorrect labels and placards, followed by installations that do not match the stamped plans. Both are avoidable with a complete, accurate permit set.

Related: Permits & inspections

Educational reference, reviewed 2026-07. A design aid, not a substitute for a licensed electrician or PE. Confirm the enforced NEC edition and local amendments with your AHJ.