ONELINE STUDIO
Home Blog Revision clouds and solar resubmittals

Revision clouds and solar resubmittals

A resubmittal is not a fresh submission. It is an argument that specific comments have been addressed and nothing else moved. Revision marking is how you make that argument, and skipping it is the cheapest way to turn a two-day recheck into another full review.

The three parts

Write descriptions a reviewer can match to their own comment

Bad: "Electrical revisions." Good: "Comment 3 — added grounding electrode conductor and 250.66 sizing to one-line."

The reviewer is holding their correction list. A description that quotes their comment number lets them tick it off. A description that does not makes them go looking.

What must stay stable

This is the part people underestimate. A reviewer compares the resubmittal against the sheet they marked up. Anything that shifts without a cloud undermines that comparison:

Do not silently improve things

Tempting: while you are in there, you tidy a label, resize a conductor, move a disconnect. Uncelouded, those changes are invisible to the reviewer and they are exactly what erodes trust when found. Cloud every change, even the improvements — or leave them for the next revision.

Keep the superseded set

Archive the exact set you submitted, per revision. When a comment says "as noted on the previous submittal", you need the previous submittal, not your best reconstruction of it.

Tools that hash-link each revision make this automatic: OneLine Studio's provenance chain fingerprints every design revision so any submitted set can be verified against the lineage it came from, and you can always show what was filed when.

A short checklist

1. Cloud the change, tightly. 2. Delta beside every cloud, keyed to the table. 3. Revision table on every sheet, current level shown even where nothing changed. 4. Descriptions that reference the reviewer's comment numbers. 5. No renumbering of sheets, circuits or tags. 6. Archive the superseded set.

See also: how to read a plan-check correction and why solar permits get rejected.

> Design aid — a licensed electrician or PE must review and stamp before filing.

FAQ

What is a revision cloud on a drawing?

A cloud-shaped outline around content that changed since the last submission, paired with a numbered triangle (a delta) that ties the change to a revision table.

Do I need revision clouds on a solar resubmittal?

Most jurisdictions expect them. Without a marked change, a reviewer cannot tell what moved and generally re-reviews the entire set.

What goes in a revision table?

The delta number, a short description of the change, the date, and who made it — usually in or beside the title block on every sheet.

Related: Drawings & documentation

Educational reference, reviewed 2026-07. A design aid, not a substitute for a licensed electrician or PE. Confirm the enforced NEC edition and local amendments with your AHJ.

Draft this design in minutes — free

Describe a residential solar + storage system in plain English. OneLine Studio drafts the one-line diagram, sizes the conductors, runs these NEC checks live, and builds a permit-ready package.

Start free →