How to submit a solar permit, online or in person

Submitting a solar permit is mostly about completeness. Reviewers approve packages that contain everything they are required to check, in a form they can read. Whether you file online or at the counter, the package is largely the same — the difference is the delivery method and how you track it.

Step 1: Confirm your AHJ's requirements

Before assembling anything, find out what your AHJ requires. Most building departments publish a solar submittal checklist listing the exact sheets, the adopted code edition, and the accepted filing method. A quick call to the permit counter resolves anything unclear. Skipping this step is the most common cause of an incomplete filing.

Step 2: Assemble the package

A standard residential submittal includes:

Our breakdown of what is in a permit set covers each sheet in detail.

Step 3: Choose your submittal method

MethodHow it worksNotes
Online portalUpload PDFs, pay fees, track status onlineMost common today; watch file-size and format rules
EmailSend the set to the plan-check inboxKeep confirmation of receipt
In personBring printed sets to the counterSome AHJs still require wet copies

For online portals, follow the file-naming and PDF requirements exactly — a set that is one combined PDF when they want separate sheets can be rejected before review even starts. In person, bring the number of printed copies the AHJ specifies.

File a clean set the first time: run your design through the free Design Grader before submitting. It flags the same completeness and NEC issues a plan reviewer would, so you avoid a correction cycle.

Step 4: Pay fees and track the application

Permit fees are usually due at submittal. Once filed, note your permit or application number and check the portal (or call) for status. If corrections come back, they are typically drawing or label fixes rather than redesigns — address every comment and resubmit promptly, since the review queue, not the fix, is usually the delay.

Step 5: After approval

Once the permit issues, you can install to the approved plans — build exactly what was stamped. Then schedule inspection, and after passing, submit the signed inspection to the utility for permission to operate. Field changes should be documented and, when significant, submitted as a revision.

The takeaway

The mechanics of submitting a solar permit are simple; the difficulty is completeness and accuracy. A package that matches the AHJ's checklist, uses the right filing method, and passes code on the first read is what gets approved without a back-and-forth. No tool guarantees approval, and a licensed electrician or PE must review and stamp the design. When you are ready to build the set, start with our DIY workflow.

FAQ

What do I need to submit a solar permit?

A complete plan set (site plan, roof plan, one-line diagram, structural and equipment details), equipment datasheets, a completed permit application, and often a load calculation. Requirements vary by AHJ.

Can I submit a solar permit online?

Many AHJs now accept online submittals through a permitting portal, and some use expedited platforms. Others still require email or in-person filing. Check your building department's website.

How long does solar permit approval take?

It depends entirely on the AHJ and their queue — some issue same-day or automated approvals for standard systems, while others take days or weeks. A complete, code-correct set moves faster.

Related: Permits & inspections

Educational reference, reviewed 2026-07. A design aid, not a substitute for a licensed electrician or PE. Confirm the enforced NEC edition and local amendments with your AHJ.

Draft this design in minutes — free

Describe a residential solar + storage system in plain English. OneLine Studio drafts the one-line diagram, sizes the conductors, runs these NEC checks live, and builds a permit-ready package.

Start free →