NEC 690.56 and 705.10 solar labels and placards

Missing or wrong labels are one of the most common — and most avoidable — reasons a solar permit gets red-lined. The wording, placement, and durability are all spelled out, mostly in NEC 690.56 and 705.10, plus the rapid-shutdown marking in 690.12. Here is what actually goes on the building.

The core markings

LabelSectionWhere
Power-source directory / plaque705.10At the service disconnecting means
Rapid-shutdown label + diagram690.56(C)At the service and RSD initiator
PV system disconnect marking690.13(B)On the PV disconnect
DC conductor / max voltage & current690.53At the DC disconnect

705.10 — the power-source directory

Any building fed by more than one source needs a permanent plaque or directory at the service equipment showing where each source is: the utility service, the PV interconnection, any battery. A responder should be able to stand at the meter and know every place power can enter. Keep it accurate if the system is later expanded.

690.56 — PV system and rapid-shutdown labels

690.56 pulls together the PV-specific markings:

The 690.56(C) rapid-shutdown labels have specific formats — reflective backing, red field, white capital letters for the switch marking — and the exact wording tracks the NEC edition your AHJ enforces. For the underlying function these labels describe, see 690.12 rapid shutdown explained.

Wording, placement, and durability

Don't forget the DC disconnect data (690.53)

At the DC disconnect, a marking states the maximum system voltage, the maximum circuit current, and related values from your string-sizing math. That voltage comes straight from your cold-temperature Voc correction — if that number is wrong, the label is wrong.

Interconnection markings (705)

Where the PV ties into the main panel, 705 drives additional markings beyond the directory. A backfed breaker interconnection carries a warning that it is a power source, and if the connection relies on the 120% busbar rule or a line-side tap, the equipment marking must reflect that. Keep the interconnection label consistent with the actual point of connection shown on the one-line — mismatches between the drawn tie-in and the placard are a frequent correction.

A quick label schedule

Before you file, walk the building in your head and confirm each marking has a home:

Building your label schedule? Grade your solar design free - we run the same NEC checks a plan reviewer would, including the required placards.

Label formats and required wording changed across the 2017, 2020, and 2023 editions, and some AHJs add local amendments or approved-label lists. Confirm the enforced code with your jurisdiction, and have a licensed electrician or PE review, sign and stamp the plan set before filing or energizing. Many red-lines trace back to labels — see why solar permits get rejected.

FAQ

What does NEC 690.56 require?

690.56 requires PV system markings, including a rapid-shutdown label at the service and a plaque or directory identifying the PV system location; 690.56(C) covers the rapid-shutdown labels specifically.

What is the NEC 705.10 directory?

705.10 requires a permanent plaque or directory at the service disconnecting means showing the location of all on-site power sources, such as the utility service and the PV interconnection.

Do solar labels have to be a specific color or material?

Labels must be permanent, weather- and UV-resistant where exposed, and legible; rapid-shutdown labels use reflective, red or specified formats with white capital lettering per the section and product listing.

Related: NEC code explained

Educational reference, reviewed 2026-07. A design aid, not a substitute for a licensed electrician or PE. Confirm the enforced NEC edition and local amendments with your AHJ.

Draft this design in minutes — free

Describe a residential solar + storage system in plain English. OneLine Studio drafts the one-line diagram, sizes the conductors, runs these NEC checks live, and builds a permit-ready package.

Start free →