Nothing below is illustrative. Every figure is the actual output of a real run against a real roof, on the date shown.
Three strings on this roof. All three drop out of MPPT range at some point in the year — and no fixed-condition calculator would have said so.
A string calculator evaluates one assumed worst-case moment. This evaluates the year: every hour, every month, on this roof's own shade and cell temperature.
Fire setbacks cost this roof 26 modules — about a third of everything that would otherwise fit.
Each plane's own pitch selects the rule. This roof has seven planes and they are not all the same, so a whole-roof assumption gets it wrong.
Seismic Design Category B. A prescriptive attachment schedule is fine here — and the tool says so rather than sending you to an engineer by default.
Design values come from the USGS ASCE 7 service for this exact coordinate, then bind to the array actually drawn: its weight, its coverage, and the steepest plane it sits on.
What it will not do: ASCE wind speeds and ground snow loads sit behind an account we do not hold, so LoadBind reports them as unavailable and tells you to look them up. A structural figure that is guessed is worse than one that is missing, because a missing one gets checked.
The imagery under this roof's shade study is 35 months old, and the roof is 31% obstructed. Both together mean: re-run it.
Age alone is not risk. An unobstructed roof carries an old basis safely, because nothing near it would change. An obstructed one is where a small change moves the answer.
This one is built and not yet switched on — and it says so instead of naming the biggest utility in the state and hoping.
Territories interleave. A municipal utility can serve three streets inside an investor-owned utility's county, and the interconnection limit moves with it. Resolving that needs a territory source we do not currently hold a key for.
They live under Site Survey. The free grader needs no account at all — upload the last set you submitted and see what your plan checker will find.
Grade a plan set free